Projects

Princes Risborough School

Princes Risborough School - ongoing contract

Overall value: approximately £300,000

Client: Beard Construction

Works include: on site muck shift of approximately 2500m3, construction of deep trench fill foundations and pads, construction of 1500m2 reinforced concrete ground floor slabs, all associated foul water and surface water drainage and all external works including slabbing and forming external steps. 

 

Grandpont Pavilion

Grandpont Pavilion - completed contract

Overall value: £112,500

Client: Beard Construction

Works include: site clearance and reduced level excavations, construction of reinforced concrete raft slab, all drainage works including placement of a rainwater harvesting tank, flow control chamber, AquaCell crate system soakaway and foul water pumping station. We also laid paving slabs to the perimeter of the building. 

 

Bicester Heritage Centre

Bicester Heritage Centre - completed contract

Overall value: £285,000

Client: Beard Construction

Works include: new service trenching in existing roadways including saw cutting, excavating, placing new ducting, backfilling and reinstatement of tarmac surface.

 

Marlow Running Club

Marlow Rowing Club - completed contract

Overall value: £175,000

Client: Beard Construction

Works include: site clearance and reduced level excavations, construction of reinforced concrete raft slab, all drainage works including flow control chamber. External package including block paving, concrete apron and preparing for new tarmac surfaces. 

 

Davenies School

Davenies School - ongoing contract

Overall value: approximately £500,000

Client: Beard Construction

Works include: reduced dig for new basement and off site muck shift of approximately 1500m3, construction of deep trench fill foundations, construction of reinforced basement slab, all associated foul water and surface water drainage and all external works. 

 

New Tarmac Recycling Facility

New Tarmac Recycling Facility - ongoing contract

Overall value: £105,000

Client: Gibbs Surfacing/Tarmac

Works include: trenching for new electrical connection, foul and storm water diversion works, construction of concrete storage bays.